Prevoius Weekly Reports

   Progress report of Kunhippally ROB-30.10.15
    

 

ROB at Kunhippalli

A. Over all Progress:-Following works are completed as on 31st October 2015

Pile 60/60, Pile load test 1/1, Pile cap 16/16, Pier 16/16, Pier Cap 16/16, Girders 16/16, Deckslab 16/16, RC wall Monthal side 100%, RC wall NH side 40%, Culvert Monthal bridge side 100%, Drain Monthal bridge side 100%, Service road Monthal side 50%, Staircase Monthal side 90%.

 

B. Progress of Monthly Target for October 2015

SI.NO

ITEM DESCRIPTION

TARGET FOR October 2015

LOCATION

ACTUAL WORK EXECUTED

Location

1

Staircase Monthal side

50

Monthal side

40

Monthal side

2

Staircase NH side

100%

NH Side

0%

NH Side

3

Painting

15%

Super structure

15%

Super structure

4

Retaining wall NH side

60%

NH Side

0%

NH side

 

.  

 

 
Back
 
    
STAIRCASE WRKS @ MONTHAL SIDE1

    
    
PAINTING NH SIDE

    
    
STAIRCASE WRKS @ MONTHAL SIDE

    
    
PAINTING IP @ NH SIDE

    
 
    
STAIRCASE WRKS @ MONTHAL SIDE2

    
    
PAINTING IP

    
    
PAINTING NH SIDE (2)

    
 
 
 

 

 

 

 

 

 

 