   04.02.2011
    

 

 

Si No

Activity Description

Total Quantity

Cumulative progress upto last week

Balance  work up to last week

Cumulative delay in Qty up to last week

Work  planned  during the week

Actual work done during the week

Cumulative delay in Qty up to this week

Work  Planned for next week

1

PILE CALICUT  SIDE

30

30

0

0

0

0

0

0

2

PILE NH SIDE

33

33

0

0

0

0

0

0

3

PILE RAILWAY SPAN

20

0

20

0

0

0

0

0

4

PILE CAP CALICUT  SIDE

10

2

8

4

3

3

4

3

5

PILE CAP NH SIDE

11

10

1

1

1

1

0

0

6

PILE CAP RAILWAY SPAN

4

0

4

0

0

0

0

0

37

PIER CALICUT  SIDE

10

0

10

3

3

0

6

4

8

PIER NH SIDE

11

5

6

6

3

4.5

1.5

1.5

9

PIER RAILWAY SPAN

4

0

4

0

0

0

0

0

10

PIER CAP CALICUT  SIDE

10

0

10

0

1

0

1

3

11

PIER CAP NH SIDE

11

1

10

7

4

1

9

4

12

PIER CAP RAILWAY SPAN

4

0

4

0

0

0

0

0

13

RE/R WALL CALICUT  SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

14

RE/R WALL NH SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

16

BEAM/SLAB CALICUT  SIDE

10

0

10

0

0

0

0

0

17

BEAM/SLAB NH SIDE

11

0

11

0

0

0

0

0

18

BEAM/SLAB RAILWAY SPAN

3

0

3

0

0

0

0

0

19

HR/FP/KERB CALICUT  SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

20

HR/FP/KERB NH SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

21

HR/FP/KERB RAILWAY SPAN

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

22

BC/PAINTING

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

 

 

 

 

 

 

 

 

 

Note: Progress review done based on the revised Program (rev-01)

 

 

 
Back
 
    
P13 TO P18 LOCATIONS (03.02.2011)

    
    
R.E. WALL PANNEL CASTING (02.02.2011)

    
    
P-19 PIER FINAL LIFT (02.02.2011)

    
    
P-17 PIERCAP CONCRETING (02.02.2011)

    
 
    
P-18 PIERCAP AFTER CONCRETING (01.02.2011)

    
    
P-8 PILE CAP CONCRETING (28.01.2011)

    
    
P-6 PILECAP CONCRETING (28.01.2011)

    
 
 
 

 

 

 

 

 

 

 