Prevoius Weekly Reports

   28-01-2011
    

 

 

Si No

Activity Description

Total Quantity

Cumulative progress upto last week

Balance  work up to last week

Cumulative delay in Qty up to last week

Work  planned  during the week

Actual work done during the week

Cumulative delay in Qty up to this week

Work  Planned for next week

Remarks

1

PCC for RAFT PALAKKAD SIDE

1

0

1

1

0

0

1

1

 

2

PCC for RAFT MOYAN SCHOOL SIDE

3

2

1

1

0

0

1

1

 

4

RAFT PALAKKAD SIDE

1

0

1

1

0

0

1

0

 

5

RAFT MOYAN SCHOOL SIDE

3

1

2

1

0

0

1

1

 

7

PIER PALAKKAD SIDE

1

0

1

1

0

0

1

0

 

8

PIER MOYAN SCHOOL SIDE

3

2

1

1

0

0

1

0

 

10

PIER CAP PALAKKAD SIDE

1

0

1

1

0

0

1

1

 

11

PIER CAP MOYAN SCHOOL SIDE

3

0

3

1

1

0

2

2

 

13

RE/R WALL PALAKKAD  SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

14

RE/R WALL MOYAN SCHOOL SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

16

BEAM/SLAB PALAKKAD  SIDE

2

0

2

0

0

0

0

0

 

17

BEAM/SLAB MOYAN SCHOOL SIDE

4

0

4

0

0

0

1

0

 

18

BEAM/SLAB RAILWAY SPAN

7

0

7

0

0

0

1

0

 

19

HR/FP/KERB CALICUT  SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

20

HR/FP/KERB NH SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

21

HR/FP/KERB RAILWAY SPAN

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

22

BC/PAINTING

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: Progress review done based on the revised Program (rev-01)

 

 

 

 
Back
 
    
P6 PIER CAP (29.01.2011)

    
    
P8 PIER BAR BEANDING (29.01.2011)

    
    
BAR BENDING FOR BOWSTRING FOOTING (29.01.2011)

    
    
BOWSTRING FOOTING EXCAVATION (29.01.2011)

    
 
    
FOOTING FOR BOWSTRING (28.01.2011)

    
    
RETAINING WALL SHUTTERING (28.01.2011)

    
    
RETAINING WALL BAR BENDING(28.01.2011)

    
 
    
STAGING RP7 & P5 (28.01.2011)

      
 

 

 

 

 

 

 

 