Item Description |
Unit |
Original Quantity |
Upto Date Qty |
Excavation for roadway |
|
|
|
Cum |
1320 |
3828.14053 |
Earthwork excavation at embankment foundation |
Cum |
30210 |
19737.61618 |
Loosening, leveling and Compacting |
|
|
|
Cum |
1240 |
2436.339377 |
GSB (Grade I) |
Cum |
8050 |
5425.455213 |
wet mix macadam (WMM) |
Cum |
6900 |
4043 |
Primer coat (0.75KG/Sqm) |
Sqm |
24370 |
15825.371 |
Tack coat (0.20kg/sqm) |
Sqm |
50230 |
48928.006 |
BM (Bitumen 3.3%) |
Cum |
500 |
922.2506667 |
DBM (Bitumen 4.25%) |
Cum |
5790 |
2670.864575 |
BC (Bitumen 5.4%) |
Cum |
1860 |
0 |
CC M25 for kerb stone |
|
|
|
Rm |
8800 |
3421.8 |
PCC M15 for sub-structure - for culverts , drain, utility duct etc |
Cum |
1050 |
587.52754 |
RCC M25 for sub-structure/super structure etc for culverts , drain, utility duct |
Cum |
5070 |
2211.372235 |
HYSD bar reinforecement in sub -structure |
MT |
510 |
182.4508247 |
M20 grade concrete guard posts 200 x 200 mm x1.25 m |
Nos |
550 |
169 |
Planting of trees by the road side |
Nos |
350 |
152 |