Prevoius Weekly Reports

   weekly progress as on 5.12.2014
    

Sl. No.

Item Description

Unit

Total

Quantity

Up to date  

Quantity  

1

Clearing and grubbing road land

HA

3.9

2.94

3

Earthwork excavation at embankment foundation 

Cum

30210

19225

4

Loosening, levelingand Compacting 

Cum

1240

2437

5

Construction of sub-grade and earthen shoulders

Cum

5290

1661

6

GSB (Grade I)

Cum

8050

5289

7

 Wet Mix Macadam (WMM)

Cum

6900

3935

8

Primer coat (0.75KG/Sqm)

Sqm

24370

13630

9

Tack coat

Sqm

50230

48927

10

BM

Cum

500

1047

11

DBM

Cum

5790

3071

12

BC

Cum

1260

0

13

Kerb stone

Rm

8800

2383

14

Construction of embankment (road way cutting material)

Cum

3890

3312

15

PCC M15 for sub-structure - for culverts , drain, utility duct etc 

Cum

1050

558

16

PCC M25 for  sub-structure/super structure etc for culverts , drain, utility duct

Cum

5070

2226

17

 HYSD bar reinforecemnt in sub -structure 

MT

510

182

18

M20 grade concrete guard posts 200 x 200 mm x1.25 m

Nos

550

98

 