Prevoius Weekly Reports

   weekly progress as on 7.11.2014
    

 

SlNo

Item Description

Unit

Total

Quantity

Up to date   

Quantity   

Work Planned for October -14

Quantity of work done  for October -14

1

Clearing and grubbing road land

HA

3.9

0.17

0.30

0.17

2

Excavation for roadway 

Cum

1320

111

120.00

110.95

3

Earthwork excavation at embankment foundation 

Cum

30210

802

500.00

801.52

4

Loosening, leveling and Compacting 

Cum

1240

116

250.00

115.86

5

Construction of sub-grade and earthen shoulders

Cum

5290

23

0.00

22.70

6

GSB (Grade I)

Cum

8050

269

400.00

268.56

7

 Wet Mix Macadam (WMM)

Cum

6900

145

300.00

145.20

8

Primer coat (0.75KG/Sqm)

Sqm

24370

0

3000.00

9

Tack coat

Sqm

50230

0

15000.00

 0

10

BM

Cum

500

0

300.00

 0

12

DBM

Cum

5790

0

650.00

 0

13

BC

Cum

1260

0

0.00

 0

14

Kerb stone

Rm

8800

0

300.00

 0

15

Construction of embankment (road way cutting material)

Cum

3890

120

200.00

120.00

16

PCC M15 for sub-structure - for culverts , drain, utility duct etc 

Cum

1050

53

30.00

52.78

17

PCC M25 for  sub-structure/super structure etc for culverts , drain, utility duct

Cum

5070

45

120.00

45.00

18

M20 grade concrete guard posts 200 x 200 mm x1.25 m

Nos

550

26

50.00

26.00

 