SlNo
|
Item Description
|
Unit
|
Total
Quantity
|
Up to date
Quantity
|
Work Planned for October -14
|
Quantity of work done for October -14
|
1
|
Clearing and grubbing road land
|
HA
|
3.9
|
0.17
|
0.30
|
0.17
|
2
|
Excavation for roadway
|
Cum
|
1320
|
111
|
120.00
|
110.95
|
3
|
Earthwork excavation at embankment foundation
|
Cum
|
30210
|
802
|
500.00
|
801.52
|
4
|
Loosening, leveling and Compacting
|
Cum
|
1240
|
116
|
250.00
|
115.86
|
5
|
Construction of sub-grade and earthen shoulders
|
Cum
|
5290
|
23
|
0.00
|
22.70
|
6
|
GSB (Grade I)
|
Cum
|
8050
|
269
|
400.00
|
268.56
|
7
|
Wet Mix Macadam (WMM)
|
Cum
|
6900
|
145
|
300.00
|
145.20
|
8
|
Primer coat (0.75KG/Sqm)
|
Sqm
|
24370
|
0
|
3000.00
|
0
|
9
|
Tack coat
|
Sqm
|
50230
|
0
|
15000.00
|
0
|
10
|
BM
|
Cum
|
500
|
0
|
300.00
|
0
|
12
|
DBM
|
Cum
|
5790
|
0
|
650.00
|
0
|
13
|
BC
|
Cum
|
1260
|
0
|
0.00
|
0
|
14
|
Kerb stone
|
Rm
|
8800
|
0
|
300.00
|
0
|
15
|
Construction of embankment (road way cutting material)
|
Cum
|
3890
|
120
|
200.00
|
120.00
|
16
|
PCC M15 for sub-structure - for culverts , drain, utility duct etc
|
Cum
|
1050
|
53
|
30.00
|
52.78
|
17
|
PCC M25 for sub-structure/super structure etc for culverts , drain, utility duct
|
Cum
|
5070
|
45
|
120.00
|
45.00
|
18
|
M20 grade concrete guard posts 200 x 200 mm x1.25 m
|
Nos
|
550
|
26
|
50.00
|
26.00
|