SlNo
|
Item Description
|
Unit
|
Estimated
Quantity
|
Up to date
Quantity
|
1
|
Clearing and grubbing road land
|
HA
|
3.9
|
2.27
|
2
|
Excavation for roadway
|
Cum
|
1320
|
2221.44
|
3
|
Earthwork excavation at embankment foundation
|
Cum
|
30210
|
11108.16
|
4
|
Loosening, levelingand Compacting
|
Cum
|
1240
|
1066.18
|
5
|
Construction of sub-grade and earthen shoulders
|
Cum
|
5290
|
1638.90
|
6
|
GSB (Grade I)
|
Cum
|
8050
|
3670.55
|
7
|
Wet Mix Macadam (WMM)
|
Cum
|
6900
|
2491.95
|
8
|
Primer coat (0.75KG/Sqm)
|
Sqm
|
24370
|
8354.55
|
9
|
Tack coat
|
Sqm
|
50230
|
35217.27
|
10
|
BM
|
Cum
|
500
|
647.00
|
11
|
DBM
|
Cum
|
5790
|
2021.17
|
12
|
BC
|
Cum
|
1260
|
0.00
|
13
|
Kerb stone
|
Rm
|
8800
|
1835.00
|
14
|
Construction of embankment (road way cutting material)
|
Cum
|
3890
|
1735.68
|
15
|
PCC M15 for sub-structure - for culverts , drain, utility duct etc
|
Cum
|
1050
|
367.75
|
16
|
PCC M25 for sub-structure/super structure etc for culverts , drain, utility duct
|
Cum
|
5070
|
1640.42
|
17
|
HYSD bar reinforecemntin sub -structure
|
MT
|
510
|
165.47
|
18
|
M20 grade concrete guard posts 200 x 200 mm x1.25 m
|
Nos
|
550
|
57.00
|
19
|
Tree planting
|
Nos
|
350
|
0.00
|