SlNo |
Item Description |
Unit |
Estimated Quantity |
Up to date Quantity |
Work Planned for August |
1 |
Clearing and grubbing road land |
HA |
3.9 |
2.27 |
0.2 |
2 |
Excavation for roadway |
Cum |
1320 |
2221.44 |
60 |
3 |
Earthwork excavation at embankment foundation |
Cum |
30210 |
11108.16 |
450 |
4 |
Loosening, leveling and Compacting |
Cum |
1240 |
1066.18 |
150 |
5 |
Construction of sub-grade and earthen shoulders |
Cum |
5290 |
1638.9 |
200 |
6 |
GSB (Grade I) |
Cum |
8050 |
3670.55 |
200 |
7 |
Wet Mix Macadam (WMM) |
Cum |
6900 |
2491.95 |
250 |
8 |
Primer coat (0.75KG/Sqm) |
Sqm |
24370 |
8354.55 |
1500 |
9 |
Tack coat |
Sqm |
50230 |
35217.27 |
8000 |
10 |
BM |
Cum |
500 |
647 |
60 |
11 |
DBM |
Cum |
5790 |
2021.17 |
450 |
12 |
BC |
Cum |
1260 |
0 |
350 |
13 |
Kerb stone |
Rm |
8800 |
1835 |
300 |
14 |
Construction of embankment (road way cutting material) |
Cum |
3890 |
1735.68 |
60 |
15 |
PCC M15 for sub-structure - for culverts , drain, utility duct etc |
Cum |
1050 |
367.75 |
30 |
16 |
PCC M25 for sub-structure/super structure etc for culverts , drain, utility duct |
Cum |
5070 |
1640.42 |
40 |
17 |
HYSD bar reinforecemnt in sub -structure |
MT |
510 |
165.47 |
3 |
18 |
M20 grade concrete guard posts 200 x 200 mm x1.25 m |
Nos |
550 |
57 |
0 |
19 |
Tree planting |
Nos |
350 |
0 |
70 |