Description |
Unit |
Total Quantity |
Cumulative production up to last week |
Work planned for this week |
Actual work done for this week |
Balance quantity |
Quantity planned for next week |
|
Road Works |
|
|
|
|
|
|
|
|
Clearing and grubbing |
Ha |
3.9 |
2.36 |
0.05 |
0.00 |
0.05 |
0.05 |
2.36 |
a) Girth 300mm to 600 mm |
Nos |
25 |
120 |
4.00 |
0.00 |
4.00 |
4.00 |
120.00 |
Dismantlingof rubble masonry, |
Cum |
100 |
192.85 |
2.50 |
0.00 |
2.50 |
2.50 |
192.85 |
Dismantling ofblock/brick masonry |
Cum |
50 |
13.32 |
1.25 |
0.00 |
1.25 |
1.25 |
13.32 |
Dismantling of advertisement boards, sign boards |
Nos |
60 |
28 |
2.50 |
13.00 |
-10.50 |
2.50 |
41.00 |
Dismantling of Reinforced cement concrete |
Cum |
40 |
47.33 |
1.25 |
0.00 |
1.25 |
1.25 |
47.33 |
Dismantling of cement concrete |
Cum |
50 |
31.256 |
1.25 |
0.00 |
1.25 |
1.25 |
31.26 |
Dismantling of flexible pavements |
Cum |
450 |
25.955 |
2.50 |
5.04 |
-2.54 |
2.50 |
31.00 |
Excavation for roadway |
Cum |
1320 |
2528.775 |
37.50 |
0.00 |
37.50 |
37.50 |
2528.78 |
Earthwork excavation including removal of unsuitable soil |
Cum |
30210 |
11050.17 |
125.00 |
132.95 |
-7.95 |
125.00 |
11183.12 |
Loosening, levelingand Compacting original ground |
Cum |
1240 |
1276.44 |
125.00 |
0.00 |
125.00 |
125.00 |
1276.44 |
Construction of sub grade |
Cum |
5290 |
1128.9 |
100.00 |
0.00 |
100.00 |
100.00 |
1128.90 |
Construction of granular sub-base |
Cum |
8050 |
3421.925 |
112.50 |
0.00 |
112.50 |
112.50 |
3421.93 |
Wet mix macadam |
Cum |
6900 |
2217.85 |
125.00 |
6.30 |
118.70 |
125.00 |
2224.15 |
Primer coat |
Sqm |
24370 |
4000 |
1250.00 |
750.00 |
500.00 |
1250.00 |
4750.00 |
Tack coat |
Sqm |
50230 |
0 |
5000.00 |
14808.00 |
-9808.00 |
1875.00 |
14808.00 |
Bituminous macadam |
Cum |
500 |
0 |
50.00 |
219.50 |
-169.50 |
50.00 |
219.50 |
Dense graded bituminous macadam |
Cum |
5790 |
0 |
375.00 |
928.68 |
-553.68 |
375.00 |
928.68 |
Providing kerb stone size 300x 300 x 150 mm |
Rm |
8800 |
470 |
150.00 |
140.00 |
10.00 |
150.00 |
610.00 |
Random Rubble Masonry |
Cum |
210 |
50 |
5.00 |
0.00 |
5.00 |
5.00 |
50.00 |
Construction of embankment of approved materials deposited at site |
Cum |
3890 |
1114.17 |
175.00 |
30.00 |
145.00 |
175.00 |
1144.17 |
plain concrete / reinforced concretefor sub-MORTH -M15 |
Cum |
1050 |
264.77 |
6.25 |
17.45 |
-11.20 |
6.25 |
282.22 |
Cement concrete for plain concrete / reinforced concrete MORTH -M25 grade |
Cum |
5070 |
1501.99 |
65.00 |
71.41 |
-6.41 |
65.00 |
1573.40 |
Supplying, fitting and placing HYSD bar reinforcement in sub-structure |
MT |
510 |
149.022 |
6.25 |
6.85 |
-0.60 |
6.25 |
155.87 |
Providing and fixing M-20 grade concrete guard posts |
Nos |
550 |
87 |
0.00 |
0.00 |
0.00 |
0.00 |
87.00 |