   weekly progress of 14-3-2014
    

                                                                               

 

Name of Work               : STRENGTHENING, WIDENING & EXTENSION OF

                                        TIPPU SULTAN ROAD- PHASE-1 CH. 0.00 to 4.50 Km

Name of Client             : RBDCK Ltd.

Name of Engineer         : KITCO Ltd.

Name of Contractor     : ULCCS Ltd.

 

 

 

Weekly Report No.   21   for the Week ending on 14-03-2014

 

 

 

 

 

Submitted by

 

Approved by

 

 

 

 

ANURAJ K.E.

SUB-ENGINEER

ULCCS Ltd.

 

 

 

 

ABDUL HAMEED E.K.

ENGINEER IN-CHARGE

KITCO Ltd.

 

 

CONTENTS

1.    PROGRESS SUMMERY                               

2.    AREAS OF CONCERNS

3.    OVERALL WORK  PROGRESS

4.    PERFORMANCE OF THIS WEEK PROGRAMME

5.    PROGRAMME FOR NEXT WEEK

6.    MANPOWER STATEMENT FOR THE WEEK

7.    CONTRACTOR’S PLANT AND EQUIPEMNT SCHEDULE

8.    QUALITY ASSURANCE / QUALITY CONTROL RECORDS

9.    PROGRESS PHOTOGRAPHS

 

 

 

 

 

 

 

 

 

 

 

 

 

1.   PROGRESS SUMMERY                              

Project Title

:

STRENGTHENING, WIDENING & EXTENSION OF TIPPU SULTHAN ROAD PHASE 1 – CH 0.000 TO 4.500 Km

Contract No.

:

RBDC/TPS Road/T34/Vol. III/562

Client

:

RBDCK Ltd.

Engineer

:

KITCO Ltd.

Contractor

:

ULCCS Ltd.

Date of Commencement

:

21-03-2013

Completion Period (Days)

:

365

Planned  Completion Date

:

20-03-2014

Planned  Contract Finish Date

:

20-03-2014

Forecasted Completion  Date

:

20-03-2019

Elapsed Period (Days)

:

359

% Time Elapsed

:

98.35

% Appr. Physical Completion

:

53.50

% Appr. Financial Completion

:

25.97

 

2.   AREAS OF CONCERNS

Sl No.

Area of Concern

Action Required

Responsibility

Expected  Resolution by Date

Client

Engineer

Contractor

1

BM, DBM WORKS

MOBILISATION OF EQUIPMENT

 

 

ULCCS

18-03-2014

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.   OVERALL WORK  PROGRESS

Sl No

Item / Work

Unit

Schedule Quantity

Previous Cumulative progress

This Week Progress

Cumulative Progress up to 14-03-14

Physical Progress

(%)

1

Earthwork Excavation Roadway

m3

22053

19611

 --

19681

90 %

2

Loosening & Leveling

m3

5265

3708

 --

3728

90 %

3

Sub-grade

m3

12141

7567

--

7687

64 %

4

GSB

m3

8851

6954

--

7034

80 %

5

WMM

m3

7369

6055

90

6755

92 %

6

Dismantling RRM

m3

300

163

 --

163

95 %

7

Dismantling CC

m3

80

125.694

 --

125.69

100 %

8

Earthwork Excavation Culvert

m3

3522

1196

45

1331

76 %

9

PCC M15

m3

154

53.6

4.1

66.92

72 %

10

RCC M35

m3

377

41.4

 7.9

65.40

64 %

11

HYSD Bar

kg

56000

18171

850

21621

64 %

12

Site Clearance

ha

4.41

2.35

0.01

2.36

95 %

13

DRM

m3

300

33

 --

33

25 %

14

RRM

m3

585

556

 --

556

95 %

 

 

 

 

 

 

 

 

 

 

4.   PERFORMANCE OF THIS WEEK PROGRAMME

Sl. No

Item / Work

Location

Unit

Planned Quantity

Executed quantity

 
 

1

Earthwork Excavation Roadway

4/080-4/220 (LHS)

m3

100

--

 

2

Loosening & Leveling

4/080-4/220 (LHS)

m3

30

--

 

3

Sub-grade

4/080-4/220 (LHS)

m3

60

--

 

4

GSB

 

m3

50

 --

 

5

WMM

3/800 - 4/080 (LHS)

m3

300

90

 

6

Dismantling RRM

 

m3

 --

-- 

 

7

Dismantling CC

 

m3

 --

 --

 

8

Earthwork Excavation Culvert

1/800(RHS),1/190(RHS)

m3

60

45

 

9

PCC M15

1/800,1/300,0/840(LHS) & 0/870 (RHS)

m3

5

4.1

 

10

RCC M35

3/450,2/950,2/460, 0/840,1/930&0/870 (LHS)

m3

10

7.9

 

11

HYSD Bar

 

kg

1000

850

 

12

Site Clearance

 

ha

0.08

 --

 

13

DRM

 

m3

--

 --

 
 

 

5.   PROGRAMME FOR NEXT WEEK

l No

Item / Work

Unit

Planned Quantity Next week

 
 

1

Earthwork Excavation

m3

50

 

2

Loosening & Leveling

m3

15

 

3

Sub-grade

m3

50

 

4

GSB

m3

50

 

5

WMM

m3

100

 

6

BM

m3

300

 

7

Dismantling CC

m3

 --

 

8

Earthwork Excavation Culvert

m3

50

 

9

PCC M15

m3

5

 

10

RCC M35

m3

10

 

11

HYSD Bar

kg

1250

 

12

Site Clearance

ha

0.05

 

13

DRM

m3

--

 
 

6.   MANPOWER STATEMENT FOR THE WEEK

SL.NO

DESIGNAITION

PRESENT

STAFF

PRESENT

Remarks

1

Carpenter

-

Project Manager

 

 

2

Mason

5

Asst. Project Manager

 

 

3

Steel Fixer

2

Site Engineer

1

 

4

Labour

13

Plant Engineer

 

 

5

Store Helper

 

QA/QC Engineer

 1

 

6

Electrician Helper

 

Quantity Surveyor

 

 

7

Site Security

 

Planner

 

 

8

Office Boy

 

Safety Officer

 

 

9

Tea Boy

 

Supervisors

1

 

10

Sweeper

 

Foreman

 

 

11

Safety Asst

 

Jnr. Foreman

 

 

12

Lab. Asst

 

Surveyor

1

 

13

Receptionist

 

Draughtsman

 

 

14

Document Controller

1

Secretary

 

 

15

Time Keeper

 

Store Keeper

 

 

16

Others

15

Others

 

 

 

TOTAL

37

 

4

 

 

7.CONTRACTOR’S PLANT AND EQUIPEMNT SCHEDULE

SL.NO

MACHINERIES

OWN

HIRE

QTY

 SL.NO

MACHINERIES

OWN

HIRE

QTY

1

Concrete Plant

1

-

1

10

JCB

-

2

2

2

Concrete Pumps

-

-

 

11

Excavator

1

-

1

3

Vibrator

1

-

1

12

Pick Up

-

-

-

4

Crane

-

-

-

13

Hot Mix Plant

-

-

-

5

Truck/Tipper

2

3

5

14

Paver Finisher

-

-

-

6

Tanker

1

-

1

15

Bitumen Finisher

-

-

-

7

Roller (Vibratory)

1

1

2

16

Pilling RIG

-

-

-

8

Roller (Static)

-

-

-

17

Lab Test Equipment

-

-

-

9

Generator

-

-

-

18

Others

1

-

1

 

8.   QUALITY ASSURANCE / QUALITY CONTROL RECORDS

Sl No.

Item

Date submitted

Date Returned

Status

Remarks

1

NCR

-

-

-

-

2

Inspection requests

 

 

 

3  Nos.

3

Calibration Certificates

 

 

 

 

4

Test Conducted

 

 

 

 

4a

FIELD COMPACTION

 

 

O.K

WMM(2 tests)

4c

GRADATION

 

 

O.K

WMM(1 test)

Any Other Quality Related Issues

 

 

 

 

 

 

 

 

 

9.   PROGRESS PHOTOGRAPHS(Attached)

 
Back
 
    
WMM

    
    
GSB FOR JUNCTION CH 3540

    
    
BUS SHELTER FOUNDATION

      
 

 

 

 

 

 

 

 

Untitled Document