   26.11.2010
    

 

RBDCK Engineer-Shri Ajaykrishnan, Contact No.9745319841

KITCO Engineer - Shri Sunny Jacob, Contact No. 9447649366 

GPT Engineer - Shri Rajasekharan, Contract No.9745410482

 

Progress Report For Parappanangadi ROB for the week ending on 26-11-2010
Si No  Activity Description  Total Quantity Cumulative progress upto this week  Balance  work  Cumulative delay in weeks  Work  planned  during the week  Actual work done during the week  Delay for the week    Work  Planned for next week  Remarks 
1 PILE CALICUT  SIDE 30 0 30 14 0 0 30 0  
2 PILE NH SIDE 33 23 10 6 0 6 10 0  
3 PILE RAILWAY SPAN 20 0 20 14 0 0 20 0  
4 PILE CAP CALICUT  SIDE 10 0 10 11 0 0 10 0  
5 PILE CAP NH SIDE 11 0 11 12 0 0 11 0  
6 PILE CAP RAILWAY SPAN 4 0 4 11 0 0 4 0  
7 PIER CALICUT  SIDE 10 0 10 8 0 0 9 1  
8 PIER NH SIDE 11 0 11 11 1 0 10 1  
9 PIER RAILWAY SPAN 4 0 4 9 0 0 3 1  
10 PIER CAP CALICUT  SIDE 10 0 10 6 1 0 8 1  
11 PIER CAP NH SIDE 11 0 11 4 1 0 5 1  
12 PIER CAP RAILWAY SPAN 4 0 4 7 0 0 2 2  
13 RE/R WALL CALICUT  SIDE 100% 0 100% 0 0.00% 0.00% 0.00% 0.00%  
14 RE/R WALL NH SIDE 100% 0 100% 0 0.00% 0.00% 0.00% 0.00%  
16 BEAM/SLAB CALICUT  SIDE 10 0 10 0 0 0 0 0  
17 BEAM/SLAB NH SIDE 11 0 11 0 0 0 0 0  
18 BEAM/SLAB RAILWAY SPAN 3 0 3 0 0 0 0 0  
19 HR/FP/KERB CALICUT  SIDE 100% 0 100% 0 0.00% 0.00% 0.00% 0.00%  
20 HR/FP/KERB NH SIDE 100% 0 100% 0 0.00% 0.00% 0.00% 0.00%  
21 HR/FP/KERB RAILWAY SPAN 100% 0 100% 0 0.00% 0.00% 0.00% 0.00%  
22 BC/PAINTING 100% 0 100% 0 0.00% 0.00% 0.00% 0.00%  
 
Back
 
    
P-18 A CONCRETING

    
    
P-15 A CONCRETING

    
    
P-12 B BOARING

    
    
P 15 C CONCRETING

    
 
    
P 13 C CONCRETING

      
 

 

 

 

 

 

 

 