Prevoius Weekly Reports

   12/11/10
    

 

Si No

Activity Description

Total Quantity

Cumulative progress upto last week

Balance  work

Cumulative delay in weeks

Work  planned  during the week

Actual work done during the week

Delay for the week 

Work  Planned for next week

Remarks

1

PILE CALICUT SIDE

27

 

27

12

 

 

 

 

 

2

PILE NH SIDE

36

 4

36

12

9 piles

4

4

10

 

3

PILE RAILWAY SPAN

16

 

16

11

 

 

 

 

 

4

PILE CAP CALICUT SIDE

9

 

9

8

 

 

 

 

 

5

PILE CAPNH SIDE

12

 

12

9

 

 

 

 

 

6

PILE CAP RAILWAY SPAN

4

 

4

11

 

 

 

 

 

 
Back
 
    
CONCRETING OF PILE P19 B (10.11.2010)

    
    
CONCRETING OF PILE P17 B(9.11.2010)

    
    
CONCRETING OF PILE P14 C (11.11.2010)

    
    
CONCRETING OF PILE P14 C (11.11.2010)

    
 
    
CASING FIXED OF PILE 18 C (11.11.2010)

    
    
CAGE LOWERING OF PILE P19 B(10.11.2010)

      
 

 

 

 

 

 

 

 