Weekly Progress Report - 07.12.2020 to 12.12.2020
 
Weekly Progress Report - 07.12.2020 to 12.12.2020
07.12.2020 08.12.2020 09.12.2020 10.12.2020 11.12.2020 12.12.2020
SS handrail work at fourth floor fire stair      
SS handrail work at fifth floor fire stair
SS handrail work at fifth floor fire stair
SS handrail work at fifth floor fire stair
Electrical earthing work at terrace floor.
Aluminum fixed window works.  
Aluminum door frame works. Aluminum fixed frame works. Aluminum fixed frame works. Aluminum fixed frame works. SS work at fire stair. SS work at fire stair.
 Excavation works for external plumbing and DG foundation.  External trenching works for plumbing. External trenching works for plumbing. External trenching works for plumbing. Aluminum Louvre work. Fire alarm cabling work.
HVAC works and Electrical cable works . HVAC works and Electrical cable works . HVAC works and Electrical cable works . HVAC works and Electrical cable works . HVAC and Plumbing Works ELV cable tray works.
External painting at east side.
External painting at north side.
External painting at north side. External painting at north side.  External painting at north side. Plumbing and painting works
 
Click here to view Previous Reports
 
    
ALUMINIUM WINDOW WORK

    
    
FIRE SAFETY WORK

    
    
ELV WORK

    
    
HANDRAIL WORK

    
    
SS HANDRAILS

    
    
TRENCHING WORKS

    
    
HVAC

    
    
HANDRAIL WORK

    
    
EXCAVATION

    
    
ALUMINUM WORK

    
 
 

 

 

 

 

 

 

 