Prevoius Weekly Reports

   Weekly Progress Report as on 12.04.2013
    
PROGRESS OF ROB and ROAD  WORK AS ON 12-04-2013.
  Description Completed/ Progress Remarks
IV ROB at Parappanangady    
  Pier cap (Total no of pier Cap- 21) Completed 21 NOS COMPLETED
  RE Wall panel casting ( total600 nos) Completed Errection completed.
  Slab calicut side  (total 10 nos ) Completed  10 nos, adjacent span completed.
  slab NH side ( 11 nos) Completed  11 nos,adjacent span completed.
  Retaining wall NH side completed completed
  Retaining wall calicut side completed  completed
  Dirt wall AP2 concreting  completed Done 100%
  Dirt wall AP1 concreting  completed Done 100%
  Handrail casting & fixing. completed  completed.
  Adjacent span RP1-P9 completed completed.
  Adjacent span RP4-P10 completed completed.
  NH side RE panel errection completed 100% completed.
  RE wall work calicut side. completed 100% completed.
  expansion joint  completed completed.
  painting-slab completed Existing structures completed (adjacent span balance ).
  Road tarring work. completed NH-side completed,calicut side approach road not completed.
  RAILWAY PORTION    
  Pilling work  Completed piling completed.
   RP1 In progress pier ,piercap completed.
   RP2 In progress pier & piercap completed.
   RP3 In progress pier & piercap completed.
   RP4 In progress pier &piercap completed.
  TEMPERORY STAGING-CENTER SPAN Completed  
  CENTER SPAN In progress slab completed,concreted.Parapet wall in progress.
  ADJ; SPAN RP3-RP4. In progress RP3-RP4 Slab completed ,HP wall in progress.
  CENTER SPAN STAGING Completed Dismantling completed and caution lifted on 20.02.13 at 2.30 pm.
  ADJ; SPAN RP1-RP2 STAGING In progress slab completed.
  BALANCE WORK    
  painting work   adj;span and Railway span,kerb 50%
  Road work calicut side.   40 m balance
  H.P.wall   RP1-RP2 SLAB,RP3-RP4 SLAB.
  Crash barrier   RP1-RP2 SLAB,RP2-RP3 SLAB.
 
Back
 
    
RP2-RP3,RP3-RP4 L.H.SIDE H.P.WALL&CRASH BARRIER COMPLETED.

    
    
H.P WALL SHUTTERING RP3-RP4 R.H. SIDE.

      
 

 

 

 

 

 

 

 