   Weekly progress report as on 06.07.2012
    
Sl No  Activity Description  Total Quantity Cumulative progress upto last week  Balance  work up to last week Cumulative delay in Qty up to last week Work  planned  during the week  Actual work done during the week  Cumulative delay in Qty up to this week Work  Planned for next week  No of days remaing for completion as per the weekly plan Remarks 
1 PILE CHERUVATHOOR  SIDE 27 27 Completed    
2 PILE PADANNA SIDE 24 24 Completed    
3 PILE CAP CHERUVATHOOR SIDE 9 9 Completed    
4 PILE CAP  PADANNA SIDE 8 8 Completed    
5 PIER CHERUVATHOOR SIDE 9 9 Completed    
6 PIER PADANNA SIDE 8 8 Completed    
7 PIER CAP CHERUVATHOOR SIDE 9 9 Completed    
8 PIER CAP PADANNA SIDE 8 8 Completed    
9 RE/RC WALL CHERUVATHOOR  SIDE 100% 80% 20% 20% 0.00% 0.00% 20.00% 0.00%   RE Panel works held up due to rain and unavailability of red earth
10 RE/RC  WALL PADANNA SIDE 100% 42% 58% 5% 3.00% 2.00% 1.00% 3.00%   RC Wall 2nd lift complete for both sides
11 BEAM/SLAB CHERUVATHOOR  SIDE 9 6 3 1 1 0.5 0.5 0.5   P10-P9 Girder complete
12 BEAM/SLAB PADANNA SIDE 8 7 1 complete except railway adjacent span    
13 EXPANSION JOINT CHERUVATHUR SIDE 9 5 4 0 0 0 0 0    
14 EXPANSION JOINT PADANNA SIDE 8 1 7 3 3 0 3 3   complaint for generator.
15 KERB CHERUVATHOOR  SIDE 100% 67.50% 33% 0 0.00% 0.00% 0.00% 0.00%   kerb complete for AP2-P10 spans
16 KERB PADANNA SIDE 100% 60% 40% 0 24.00% 24.00% 0.00% 0.00%   2 spans complete this week(P5-P6,P6-P7)
17 HANDRAIL CHERUVATHUR SIDE 100% 45% 55% 0 0.00% 0.00% 0.00% 0.00%   complete for AP2-P10 spans
18 HANDRAIL PADANNA SIDE 100% 12% 88% 24% 24.00% 36.00% 0.00% 24.00%   3 spans complete this week(P2-P3,P3-P4,P4-P5)
17 BC/PAINTING 100% 0 100% 0 0.00% 0.00% 0.00% 0.00%    
18 Others                   Drainage works complete for 56 m at chr side.
19 Deck Slab                    
20 Utility shifting                    
                       
                       
                       
  Availbility of Men                     
  Date 30-06-2012 01-07-2012 02-07-2012 03-07-2012 04-07-2012 05-07-2012 06-07-2012      
  No of labours 57 35 57 57 57 56 57      
                       
  Material Stocking Status Required Available Remarks              
  Coarse Aggreagate (m3) available                
  Fine Aggreagate(m3) available                
  Cement(bag) 400 300 shortage at site            
  Steel(MT) 12 20              
                       
                       
  Utility shifting                    
  Utilities to be shifted Status Remarks                
  BSNL  Obstruction at Padanna side RC wall area cleared.            
  KSEB in progress electric post infront of unity hospital need to be shifted urgently.            
  KWA currently can be managed at site                   
  Others                    
 
Back
 
    
RC WALL 2ND LIFT CONCRETE AT LHS OF PADANNA SIDE

    
    
P10-P9 GIRDER CONCRETE

    
    
P9-P8 GIRDER REINF. IP

    
    
P6-P7 KERB CONCRETE

    
 
 
 

 

 

 

 

 

 

 