FOOTING CONCRETING,CURING AT THE P8 LOCATION
|
| | |
EXCAVATION AT RE WALL PORTION
|
| | |
CURING AT THE TRESTLE COLUMN,TRESTLE BEAM AT P7 LOCATION
|
| | |
EXCAVATION AT RE WALL PORTION.
|
| | |
|
EXCAVATION AT RE WALL PORTION
|
| | |
DESHUTTERING OF THE TRESTLE BEAM AT P8 LOCATION.
|
| | |
CURING AT THE TRESTLE COLUMN,TRESTLE BEAM AT P7 LOCATION
|
| | |
|
|
|