Prevoius Weekly Reports

   Weekly progress report as on 27.01.2012
    
 

Si No

Activity Description

Total Quantity

Cumulative progress upto last week

Balance  work up to last week

Cumulative delay in Qty up to last week

Work  planned  during the week

Actual work done during the week

Cumulative delay in Qty up to this week

Work  Planned for next week

No of days remaing for completion as per the weekly plan

Remarks

1

PILE SHORNUR  SIDE

9

9

 

 

 

Completed

 

 

 

2

PILE M.C SIDE

36

36

 

 

 

Completed

 

 

 

 

3

PILE CAP SHORNUR SIDE

3

3

 

 

 

Completed

 

 

 

 

4

PILE CAP  M.C SIDE

12

12

 

 

 

Completed

 

 

 

 

5

PIER SHORNUR  SIDE

3

3

 

 

 

Completed

 

 

 

 

6

PIER M.C SIDE

12

12

 

 

 

Completed

 

 

 

 

7

PIER CAP SHORNUR  SIDE

3

3

 

 

 

Completed

 

 

 

 

8

PIER CAP M.C SIDE

12

12

 

 

 

Completed

 

 

 

 

9

RCC WALL SHORNUR SIDE

100%

69

31%

0

20.00%

5.00%

63.00%

20.00%

0

Shuttering work for one side of RCC Reinforcement and shuttering work for outer kerb work on the other side completed.

10

RE/R WALL M.C SIDE

100%

63

35%

0

25.00%

8.00%

13.00%

25.00%

0

Friction slab PCC completed for a distance of 25 metres on both sides of RE wall.Friction slab reinforcement completed for 20 metres on one side and the other side is in progress.

11

BEAM/SLAB SHORNUR SIDE

3

2

1

0

0

0

0

0

0

 

12

BEAM/SLAB M.C SIDE

12

11

1

0

1

1

0

0

0

Painting work of the beam and deck slab bottom are in progress.FIVE spans have been completed.

13

HR/FP/KERB SHORNUR  SIDE

100%

62

38%

0

0.00%

0.00%

0.00%

0.00%

0 days

footpath slab(P1-P2 )completed.

14

HR/FP/KERB M.C SIDE

100%

59

41%

0

10.00%

2.00%

6.00%

10.00%

 

.Footpath slab concreting completed in 11 spans.Precast footpath slab settings are in progress.

15

BC/PAINTING

100%

20

80%

0

20.00%

7.00%

0.00%

20.00%

 

painting in progress .Three spans completed.

16

Deck Slab

 

 

 

 

 

 

 

 

 

 

17

Utility shifting

 

 

 

 

 

 

 

 

 

 

18

RCC WALL M.C SIDE

100%

0

100

 

30.00%

20.00%

 

30.00%

 

RCC wall (foundation) RAFT concreting completed upto40 metreson the other side RCC wall concreting completed for 6 metres.Raftconcreting is completed on both sides.RCC wall shuttering completed for 30 metres(full lift and half lift) 

 

Availbility of Men             
Date 21-1-2012 22-1-2012 23-1-2012 24-1-2012 25-1-2012 26-1-2012
Nof labours 28 27 27 28 28 28 

 

Material Stocking Status          
  Required Available Remarks    
Fine aggregate {cft} 300 356      
Cement(bag) 450 100 stock will be replendished    
Steel inT 5.75 6      
Coarse Aggreagate (cft) 300 325      
Utility shifting  
Utilities to be shifted  
BSNL COMPLETED
KSEB COMPLETED
KWA COMPLETED
Others COMPLETED 

 

 

 

 